References
Power Plants
EREN ENERGY
The water treatment plant for Eren Energy’s 1360 MW Thermal Power Plant has been designed, manufactured and installed by Aquamatch in 2008. In 2015, Eren Energy built an additional 1200 MW PP. Aquamatch completed the water treatment complex for this new power plant at the same year. This is the largest desalination project in Turkey and consists of Ultrafiltration, Seawater Reverse Osmosis and Brackish Water Reverse Osmosis. Aquamatch enlarged the system in the 2017. The total capacity of the desalination plant is 31680 m3/day.
ENKA POWERPLANT (TURKEY)
The desalination plant for ENKA’s 1500 MW Power Plant has been designed, manufactured and installed by Aquamatch in June 2011. The system treats Aegean Seawater with ultrafiltration, reverse osmosis and second pass reverse osmosis with the capacity of 1440 m3/day.
WHITEGATE GAMA POWER PLANT (IRELAND)
Water Treatment Plant for 400 MW Combined Cycle Gas Turbine Plant has been designed, manufactured and installed by Aquamatch in 2011. The system treats brackish water with multimedia filters, ultrafiltration, double pass Reverse Osmosis and mixed bed with the capacity of 2880 m3/day.
RENAISSANCE HOLDING
Water treatment of Demineralized Process Water for Azer Energy Janub Gas Steam CCPP Project, has been designed, manufactured and installed by Aquamatch in 2013. The system treats river water with ultrafiltration, reverse osmosis and demineralization with the capacity of 4800 m3/day.
TEKFEN
The process water treatment system for Tekfen Power Plant has been designed, manufactured and installed by Aquamatch in 2012. The system treats dam water with ultrafiltration, reverse osmosis and mixed bed demineralization with a capacity of 2640 m3/day.